Warehouse Project Management

Warehouse Project Management

Apply basic principles of Warehouse Project Management to the use of materials, plant and labour on construction projects.

Note: To detect plagiarism and cheating in this course, all student papers will be reviewed through the software program, Turn-it-In located in WebCampus. A “similarity” score should be under 20%. The number of direct quotes within an assignment (despite being accurately cited) will be strictly limited and will be listed in the assignment grading rubric. Please check the Q &A post on Canvas if you have any questions.

 

To submit your paper:

  • An electronic copy should be submitted in the assignment drop box by the due date.
  • Papers received after this time will be considered late. If illness or an emergency prevents a student from meeting deadlines, the instructor must be notified before class.

 

Evaluation Criteria for Paper
(10%) Resources used as rationale for approaches and as sources of content
(5%) Use at least one journal article relevant to the case as a reference
(5%) Use at least one textbook as a reference

_____ 5. (20%) write paper in a scholarly manner
(4%) Format includes title page, body of paper, & reference page, with pages numbered

_____ 5. (20%) Wrie the paper in a scholarly manner
(4%) Format includes title page, body of paper, & reference page, with pages numbered

APA style
(4%) Limit the paper to 4 pages in length, which includes title page and reference page
(4%) Cite references in the paper according to APA style
(4%) list References on the reference page according to APA style
(4%) Grammar, language, spelling, and sentence structure are at a college writing level

Get a 10 % discount on an order above $ 100
Use the following coupon code :
Nursing10

Oooops