Read the attached “Ready-Energy” case and format a Risk Register
Read the attached “Ready-Energy” case and format a Risk Register
Question 4 (8 points). Using a Risk Register and Rating Scale: case analysis
Read the attached “Ready-Energy” case and format a Risk Register (you can use the template in “Content” session 7 discussion forum or develop your own in Excel).
The paper should be written in the student’s own words, and no more than 4 pages in length, including a title page and reference page. This means two pages of content, which requires clear and focused writing. Avoid excessive use of quotations. Include page numbers, clear and accurate writing, following APA (7th ed.) style. Use double spacing, 10-12 font, with 1-inch margins.
A “similarity” score should be under 20%. Please check the Q &A post on Canvas if you
have any questions.
To submit your paper:
- Submit an electronic copy in the assignment drop box by the due date.
If illness or an emergency prevents a student from meeting deadlines, the instructor must be notified before class.
Evaluation Criteria for Paper
A “similarity” score should be under 20%. Please check the Q &A post on Canvas if you have any questions.
(10%) Resources used as rationale for approaches and as sources of content
_____ 5. (20%) write paper in a scholarly manner
(4%) Format includes title page, body of paper, & reference page, with pages numbered
_____ 5. (20%) Write the Paper in a scholarly manner
(4%) Format includes title page, body of paper, & reference page, with pages numbered
APA style
(4%) Limit the paper to 4 pages in length, which includes title page and reference page
(4%) Cite references in the paper according to APA style
(4%) list References on the reference page according to APA style
(4%) Grammar, language, spelling, and sentence structure are at a college writing level
Use the following coupon code :
Nursing10